Build a Deck

How Long does it Take to Build a Deck? – Remodel on Point

Last Updated: 2022-02-16By

If you compare an apartment and a private house, then first of all the difference will be in the availability of a plot around the house, which you can use at your discretion. One of the most popular uses for a portion of this area is by building a deck. This is a very common extension to the house, so every homeowner wants to build one.

So how long does it take to build a deck? The answer will be from 3-5 days to a month of work, not including the time for obtaining permits. This time difference is due to the complexity of the task, the size of the deck, the number of employees, and many other details.

There are standard deck options that are easy and fairly quick to build, as well as multi-level decks with many additional elements. Because of this, there is a big difference in the time it takes to build the deck.

Standard Size Deck

A single-level deck with dimensions of 300 – 400 sq. Is considered a standard one. ft. They can be of different shapes, both rounded and rectangular. On average, the construction of such a deck takes 5 – 7 days.

ProcessNeeded Time
Removing the old deck4 – 6 hours
Installation of supports5 – 6 hours
Deck framing1 -2 days
Vinyl installation1 day
Railings1 day
Time required for a simple deck 300 – 400 sq/ft.
[instagram-feed]

Removing the Old Deck

In most cases, every house already has a deck, and when it comes to installation, it is the replacement of the deck that is meant. Therefore, to install a new deck, you first need to dismantle the old one.

The dismantling process usually takes about half a day, provided that it is carried out by 2-3 people. During this process, the old deck is completely removed and the area is cleared for the installation of new supports.

Installation of Supports

The next step is the installation of supports on which the new deck will be held. A hole 3 to 4 feet deep is dug under each support, the support is installed and concrete is poured over it. This stage of the work is physically difficult and it is better to perform it with at least two people. This process can also take about half a working day.

It should also be noted that before proceeding with the installation of the frame, it takes time for the concrete to dry. Therefore, professional decks installers finish the installation of the supports at the end of the working day, and the concrete hardens overnight.

Deck Frame Construction

Installing a new deck frame is one of the most time-consuming processes. Depending on the number of people performing the installation, the process usually takes 1 – 2 days. For example, if you want to install faster, then you can attract more workers and four of them can do this work in a day.

Vinyl Installation

This is followed by the installation of the deck. 1 day is safely allocated for this part of the work since it is also associated with physical activity and the need for accuracy. The choice of material does not greatly affect the installation speed. The difference can only be that if you did not order the material in advance, but it was not in stock. In this case, you will of course have to wait for the next delivery.

Pressure treated wood, cedar wood, or composite material are usually used as the deck cover. Each of these materials has its distinctive properties. However, when the question of how long does it take to build a deck becomes relevant, then it is worth choosing materials before starting construction.

Railings

When the deck is almost ready, all that remains is to install a railing for your safety. It also takes a full day to install the railing and prepare the deck for the final look. After this process, you will already be able to fully use the resulting extension. This completes the work of the builders, and you just have to equip the deck. The installation of the grill, furniture, and other elements is very individual and depends on how you planned everything.

How Long does it take to Build a Deck with Custom Size and Form?

While everything is very clear with the standard deck sizes and shape, with custom decks it is much more complicated. We cannot accurately describe how long each process will take due to their individuality.

Usually, when it comes to non-standard decks, not knowing the exact design, any builder will answer you – up to 3-4 weeks. This is the maximum time that can be spent on the construction of the most complex structures, with many levels and transitions. In addition, the deck can be very impressive in size and this is also worth considering.

However, if you want to have a rough idea of ​​how long does it take to build a deck in your home, you can use the numbers described for standard decks. How can this be done correctly?

Well, first of all, you need to know exactly the size and shape of your future deck. You also need to understand how many different transitions and levels there will be. After that, you just need to compare the dimensions of the standard deck with yours and calculate the time.

Let’s look at a simple example for a better understanding. In your design, a simple one-level deck came out, but of a large size, for example, 600 – 700 sq. ft. In this case, you should not worry that its installation will take as much as 3-4 weeks. Knowing that the same smaller deck takes 5-7 days, you can expect that the whole process will take no more than 10 days for you.

If you have a more complex project in your plans, then it is better to discuss it with those who will perform the installation. A company representative will calculate in detail all the necessary work and how long it will take to complete them.

What Can Increase the Installation Time?

  1. Bad weather
  2. Need for inspection
  3. The uneven, rocky surface

Even with an accurate plan for the time required to install a new deck, additional difficulties can be encountered. Some of them can be prepared and avoided, but there are those that you cannot influence.

One of these uncontrolled processes is the weather. Since the deck is installed outdoors, it is done in good weather. If it rains heavily for several days, the work will have to be postponed.

The second factor that will affect how long does it take to build a deck can be the legislation in your city. Most cities in the USA require an inspection of the quality of concrete poured. And since inspectors have their schedule, waiting for it may take additional time.

The speed at which the deck is set can also be influenced by the landscape of your yard and the composition of the ground. For example, it is much easier to set up the deck on flat, soft ground than on a steep slope. In addition, the ground may be very rocky, and digging holes under the supports will be much more difficult, which will affect the time of work.

How to Speed up Deck Construction

  1. Agree on design
  2. Order materials
  3. Hire professionals
  4. More employees

If you want your deck to be completed as quickly as possible, then you need to think through everything in advance. First, you need to think about the design of your deck in advance. All the nuances must be agreed upon with the contractor so that they have a clear plan for the set work. Replacing the design during the construction process can significantly increase the time and cost required to complete the task at hand.

Secondly, it is much easier to do the job when all the necessary materials are present. Order everything in advance and you will not be faced with the fact that workers will need to wait for delivery. Lack of material is a very common delay during construction.

Undoubtedly, for the work to be done efficiently and quickly, it must be done by professionals. Deck installation workers can get the job done in half the time.

When choosing a company that will carry out construction, give preference to those who have many clients. When a contractor has many orders, it is in his best interest to get the job done as quickly as possible. Having signed a contract for a week, it is more profitable for him to complete the work in 4-5 days and switch to a new project, thereby earning more. In this case, you will get the same deck only much faster.

It should be understood that this work is associated with physical activity because the more people are involved in construction, the faster the process itself will be. If you are in a hurry, have four or more people build the deck. This number of workers will significantly speed up construction.

What Needs to be Done Before Starting Construction.

We examined in detail all aspects of the work that affect how long does it take to build a deck. However, it should be understood that planning for the construction of a deck begins much earlier. First, you need to think over the design. We can discuss this project with the architect so that he will provide you with ready-made drawings.

You will also most likely have to obtain a building permit. Depending on the city and state, this process can take different times. Therefore, Remodel on Point recommends that you think over the construction of the deck in advance, so that before the construction stage, you have all the blueprints and permits.

editor's pick

latest video

news via inbox

Nulla turp dis cursus. Integer liberos  euismod pretium faucibua

Each building has some sort of driveway or at least should have. The main reason is for vehicles to come closer without need to walk all the way. Some homes are residential with small driveway for their car to come in and park before garage or front entrance, and others can be large commercial buildings with loading docks, delivery entrances and casual parking entrances. On Point Remodeling was asked for suggestions on residential driveway for new home construction, and we decided to write detailed article for all our readers. Using this guide you can select the material for your driveway and see what works for your budget. Here are the materials for driveway we will be discussing in our guide:
  • Asphalt
  • Concrete
  • Paver Stone
  • Crushed stone
  • Brick
  • Seashell
  • Gravel
To find good contractor for your driveway, you can either ask our team by email or try to find someone local that worked with neighbors or nearby buildings.

Installation process of any material surface on your driveway

a) Demolition and Excavation – Before anything is done, your contractor will get heavy machinery and scratch off old layer of driveway. They need to go down at least 5-6 inches to insure proper layering before your final layer of material is installed. b) Material Purchase and Delivery – At this point your contract is signed and you already know how the surface will look. Contracting company purchases necessary materials and delivers them to site. Double check if material is correct and not damaged. c) Preparation of Sublevel – Whatever you place as final material, it cannot just be installed directly on top soil. Gravel is the first choice of material that goes down at this stage. Other preferred material is screen sand that can go on top of gravel and works better with stone and bricks. d) Compaction of Ground – To prevent your driveway from moving and changing shapes, all the layers from bottom up have to be properly compacted. Do not leave any spot untouched while doing this or you can get small holes and cracks in driveway after installation. E) Final Installation – This is when all the magic happens. After all preparations and dirty work the final installation is made literally within hours and you can enjoy new driveway. Stone and brick is set up by hand, while other materials require some sort of machinery with manual labor to even out surface.

1. Asphalt

Probably the most used material for road top surfaces as well as driveways is asphalt. This is a mix of gravel and sand that is mixed in and combined by asphalt cement with crude oil. Pros of Asphalt Driveway
  • Very popular and easy to find materials/contractor
  • Completed in 1 day and you can drive on it after
  • Patches and small holes can be fixed fast
Cons of Asphalt Driveway
  • Easy to damage and cracks appear in few years
  • Almost everyone else has same surface
  • Oily surface and chemicals used in mix
Prepared for asphalt driveway will cost you around $5 per square foot to finish. The contractors that take care of entire process from taking out old driveway surface, install subsurface and compact the ground with new asphalt on top, will charge on average $5500 per regular size driveway at single home property.

2. Concrete

What we call concrete is a mixture of Portland cement, aggregate as well as sand with gravel. Suggested thickness of concrete for driveway is 6 inches. The mixture needs to cure without being touched or driven on top for several days. Pros of Concrete Driveway
  • Durable material for large weights
  • Long lifespan if installed properly
  • Winter and summer friendly
Cons of Concrete Driveway
  • Has marks and stains over time
  • Hard to repair without replacement
  • Super hard to DIY
To hire contractors for concrete driveway it will cost around $7-$9 per square foot. This will include site preparation with gravel spread and new concrete installation. They will order full truck of concrete (or several for larger driveways) to pour inside forming. Smoothening and curing is required after installation.

3. Paver Stone

The most luxurious material that you can use to create driveway path with is paver stone. It is made out of natural stone with uneven rough shapes that have different line patterns. Paver stones are very heavy and are perfect for weights on top of them. Almost every city in Europe has roads and walks made out of stone that were installed centuries ago. Pros of Paver Stone Driveway
  • Creative designs can be done
  • Personal looks, can match the house
  • Can replace single stone in minutes
Cons of Paver Stone Driveway
  • Weeds growing through
  • Stone can move over time
  • Most expensive material
There is wide selection of stone that can be purchased for your driveway. On average we recommend settling with $17-$20 per square foot for stone with installation included. Working with this material is very intense labor and we recommend hiring professionals that do this type of work every day.

4. Crushed Stone

Our readers sometimes mistake crushed stone with gravel, but this is not the same material. Crushed stone material is achieved when machine is mechanically crushing larger pieces of unused stone for this specific purpose. It is larger than gravel and can have smooth finish. Crushed stone can also have a mix of colors, which is much pleasant to eyes than gravel. Pros of Crushed Stone Driveway
  • Low maintenance required
  • Fits rural area style
  • Can be reused for other purposes
Cons of Crushed Stone Driveway
  • Gets very hot during summer
  • Can be messy after many drives
  • Hard to remove snow and ice
Buying crushed stone and installing it on your driveway is as easy as it gets. Similar to other rough materials discussed in this post, only small tools like shovels, dolly and buckets are required to spread it on the road. The cost of crushed stone driveway is between $4 and $6 per square foot from professional local contractors that can finish the job in several days.

5. Brick

The same brick we see being used in wall construction can be installed as top driveway surface. Brick is manufactured by compressing clay with plastic mass. It is heated to extreme temperature and dried up to become as solid as you know it. Pros of Brick Driveway
  • Variety of selections in shapes and shades
  • Bricks are recyclable
  • Slip resistant with rough top part
Cons of Brick Driveway
  • Needs regular maintenance
  • Change color over time
  • Old fashion looking
Installing brick on driveway costs $10 per square foot, which is not too far from masonry brick laying as part of the wall. To save money you can use or purchase old brick, that was part of a wall before. Do not mix these two jobs and contact landscaping professionals instead of masonry contractors that work with bricks.

6. Seashell

This material is popular on the coast line where shells can be found near the water. Construction companies use seashells to add in other materials as well as spread them on driveway in rough condition, without adding anything else. It usually comes in white or pearl color and darkens within year because of mixing with sand and dirt. Pros of Seashell Driveway
  • Environmentally friendly
  • Has natural drainage
  • Creates worm vibe of beach house
Cons of Seashell Driveway
  • Break and crack under light weight
  • Sharp and very hard to walk on
  • Gets stuck in shoes and tires
To deliver and spread seashells on driveways costs below $4, which is only slightly more expensive than rough gravel. As you go further from coast line, cost of material increases due to delivery. This material is elegant and very soft. We recommend adding edge lines with darker color landscape material to create visual path.

7. Gravel

This material is used in other construction mixes and underlayment systems. It’s literally fragments and small crushed stones that are put on top of soil. It is easily spread out by hands and anyone can do it. Pros of Gravel Driveway
  • Cheapest of them all
  • Easy DIY Job
  • Can install another material on top
Cons of Gravel Driveway
  • Needs to be graded very often
  • Will mix with dirt and leaves
  • Washes up with heavy rains
It is rough material and can be purchased in bulk (by metric tons or cubic meters). The cost of driveway with gravel should not exceed $3 per square foot, but you can save tons of money by purchasing materials and doings installation by yourself. You do not require specific tools or heavy equipment for the job and delivery of gravel can be arranged directly to your project.

Conclusion

To properly finish any and all of these driveways requires skills and experience. There is no way you can complete any of these projects without heavy equipment and tools that regular home owner’s just store in their garages. Most of those who will read this post will prefer to install asphalt driveway, because of its popularity and low costs. We want to encourage home owners to go for personal preference and what matches your house, rather than getting the most affordable and popular items. Driveway jobs have to be completed fast; otherwise you will need to park elsewhere while the project is running. To not overpay, ask us for quotation sample on material you prefer in specific region where the work need to be done and our team can provide some numbers.