Average 1000 sq ft condo takes 4-6 weeks to renovate with complete upgrade. This includes entire work process with deliveries and installation of materials. Time to prepare for condo renovation and agree on specific time with building management is not included.

Although may seem like a simple job, condo renovation takes a long time to complete. Biggest time consuming steps in remodeling apartment or condo unit in high rise building is dealing with management and arranging deliveries for all items. At best they will give you one day per week to use elevator for taking out trash and brining in tons of materials for renovation.

Here is a table of how long does it take to renovate a condo or an apartment 1000 sq ft size:

Bathroom ProjectKitchen RemodelingFull Condo/Apartment Renovation
Preparation1 Day1 Day1 Day
Demolition1 Day1 Day3-4 Days
Framing & Moving Walls1 Day3 Days
Rough ins1-2 Days2-3 Days7-8 Days
Installation of Finishes4-5 Days6 Days3-4 Weeks
Total Time 7-9 Days11-12 Days29-36 Days

There will be condo renovation companies that can complete this work much faster. Its because they have mostly inhouse crew that can work on several tasks at once. Unexperienced contractors can take longer for the same amount of work involved.

Permits and documents/drawings

This step of work is completely not necessary. Permits are almost never required to work in condo because building owner or manager would never agree on structural changes anyways. What you are allowed to do is upgrade of all materials, such as doors, floor, tiles, kitchen, tubs, trims, paint and all fixtures.

Inspections for electrical and plumbing work are mandatory, but it does not take time to schedule and you should not lose more than a day if even that.

Completely renovated luxury condo with timeline schedules

3D modeling of condo renovation upgrade.

The only home owners or contractors decide to do the drawings for condo renovation are for visualization purposes or making sure the contract for this job is detailed and confirmed with drawings. Visualization is great tool to prepare for remodeling and select exact products that match together. With drawings we can estimate exactly how long does it take to renovate a condo unit. Remodel on Point provides custom 3d designs for all renovation projects.

Preordering Materials

To continue working fast and finish project relatively fast, you have to preorder most of the materials. While most of items can be available the same day or within a week to arrive, some take much longer to deliver or manufacture.

Bathroom does not have that many exclusive items that take weeks to ship, unless your remodeling is extremely luxurious with Japanese toilets and Italian tubs that sold overseas. Our suggestion is to start shopping 1-2 weeks before remodeling starts.

Kitchen is one of the areas in condo apartment that needs precise preparation at least a month before job starts. Yes basic Ikea cabinets or similar can be purchased same day, but in reality condo owners like custom kitchens that take 4 weeks to manufacture from measuring. New appliances can take same time. We think 6 weeks is adequate time to prepare and select everything for kitchen renovation in condo.

Full condo project has many more items than just bathroom or kitchen, but because cabinets take longest to manufacture and prepare for, the time to prepare is the same. There are instances when unique floors or custom doors get there in month, but normally everything is equal or less than kitchen cabinets with appliances.

Required Time for Site Preparation before Work Begins

When the actual work starts, timing will vary from one contractor to another. It depends on their experience and ability to transition from one trade to another. Remodel on Point prepared average time with explanation how long does it take to renovate a condo or an apartment. It may not be exactly the same for all condo and apartment renovation companies, but it will give you an idea what to compare to.

In the beginning it all looks the same. Condo building has requirements to protect elevator and hallway floor towards the unit. Safety covers installed inside the apartment to protect windows or rooms that are not being touched. This takes several hours to do but we will calculate it as one day.

How Long Does Demolition Take in Condo Renovation Project

This work is fun, but very dangerous and tiring. Apartment and condo owners may at first think they want to do it on their own, but we recommend leaving it to professionals. In condo unit demolition is only of interior materials and wall separations. Agreeing with building management to arrange elevator for disposal and parking for garbage pickup is essential.

Bathroom needs only half a day to destroy and clean up. It includes ripping out tiles, removing tub with vanity and all faucets. Taking out drywall and studs can be done as well within same time.

Kitchen is slightly harder to demolish but good team of three or four people can do it in one day. We recommend disassembling cabinets instead of breaking them to carefully bring downstairs. For removal of appliances use dollies and protection material.

When work spreads for entire condo unit, demolition may take up to 3-4 days. This is simply due to short work hours and ability to use elevator. Normally company would tear out everything inside and place debris in garbage bags for first several days, and then dedicate one full day to carry it all out.

Framing and Moving Walls Around in Details

Some projects don’t even require movement of walls or additional framing and only in rare cases clients want to change layout. Remember that only nonstructural partition walls without utility lines to other units can be removed.

Bathroom work almost never requires moving any walls. Adjacent walls may have rusted or rotten existing wall frame that can be adjusted with new pieces, but we ill not count this time at all.

Same goes for the kitchen with several exceptions. When removing cabinets, frame is often damaged and it needs new strength to hold kitchen that will be installed. Also condo with apartments modernize layout with removing wall separation to make open concept kitchen and dining area. All these take 1 day to do.

Full gut project is obviously more time consuming and can take up to 4 days to complete. We understand that some jobs don’t need additional framing and to average it out our team decided to give this step 3 days with delivering material, competing the job and cleaning up with removing waste.

Rough Ins Schedule and How Long Does it Take to Renovate an Apartment

In this work category we talk about electrical, heating and plumbing lines that run behind the walls. They are often moved and upgraded during renovation in condo. Even though room positioning can be changed, hvac ducts may not be allowed to move.

In bathroom plumbing includes water lines as well as drains for tub, vanity and toilet. Licensed and knowledgeable plumber can finish work in one day. To change a light, exhaust fan, install outlet and switch, electrician needs half a day and can work together with plumber. Often trades are scheduled on separate dates and our timeline prediction for bathroom rough ins is 1-2 days.

There is more work during kitchen upgrade in condo for electrician, but slightly less for plumber. This is due to number of potlights and appliances that later will be installed. Together it should be completed in 2-3 days.

Half way there in condo renovation process

Flooring and cabinets installed in apartment remodeling.

The rest of the house has tons of other electrical work and nothing that involves plumbing or drain rough ins. We estimated complete remodeling condo rough ins to be completed in 7-8 working days.

How Long Interior Finishes Should Take in Condo

Visible and attractive part of any condo or apartment unit comes from finishing details. Tiles, flooring, doors, trims and paint are things everyone pays attention to when looking at remodeled condo.

Average 3 piece bathroom in condo has close to 90-120 sq ft of tiles, some trim work and painting that can be completed in 4-5 days. It starts with drywall or purging walls and ends with coat of paint. To speed up process many contractors use portable fans that help drying mud and paint.

You would be surprised, but kitchen renovation process in apartment does not take much longer. Cabinets can be assembled in one day and everything else completed during the same week. Our estimate for completing kitchen condo finishes during upgrade is 6 days.

Estimating exact timeline for finishing stage in 1000 sq ft condo apartment is harder. There could be luxury walk in closet cabinets, installation of fireplace, tv units and many more items. Without including extra ordinary Remodel on Point suggest giving it 3-4 weeks for last stage.

editor's pick

latest video

news via inbox

Nulla turp dis cursus. Integer liberos  euismod pretium faucibua

Each building has some sort of driveway or at least should have. The main reason is for vehicles to come closer without need to walk all the way. Some homes are residential with small driveway for their car to come in and park before garage or front entrance, and others can be large commercial buildings with loading docks, delivery entrances and casual parking entrances. On Point Remodeling was asked for suggestions on residential driveway for new home construction, and we decided to write detailed article for all our readers. Using this guide you can select the material for your driveway and see what works for your budget. Here are the materials for driveway we will be discussing in our guide:
  • Asphalt
  • Concrete
  • Paver Stone
  • Crushed stone
  • Brick
  • Seashell
  • Gravel
To find good contractor for your driveway, you can either ask our team by email or try to find someone local that worked with neighbors or nearby buildings.

Installation process of any material surface on your driveway

a) Demolition and Excavation – Before anything is done, your contractor will get heavy machinery and scratch off old layer of driveway. They need to go down at least 5-6 inches to insure proper layering before your final layer of material is installed. b) Material Purchase and Delivery – At this point your contract is signed and you already know how the surface will look. Contracting company purchases necessary materials and delivers them to site. Double check if material is correct and not damaged. c) Preparation of Sublevel – Whatever you place as final material, it cannot just be installed directly on top soil. Gravel is the first choice of material that goes down at this stage. Other preferred material is screen sand that can go on top of gravel and works better with stone and bricks. d) Compaction of Ground – To prevent your driveway from moving and changing shapes, all the layers from bottom up have to be properly compacted. Do not leave any spot untouched while doing this or you can get small holes and cracks in driveway after installation. E) Final Installation – This is when all the magic happens. After all preparations and dirty work the final installation is made literally within hours and you can enjoy new driveway. Stone and brick is set up by hand, while other materials require some sort of machinery with manual labor to even out surface.

1. Asphalt

Probably the most used material for road top surfaces as well as driveways is asphalt. This is a mix of gravel and sand that is mixed in and combined by asphalt cement with crude oil. Pros of Asphalt Driveway
  • Very popular and easy to find materials/contractor
  • Completed in 1 day and you can drive on it after
  • Patches and small holes can be fixed fast
Cons of Asphalt Driveway
  • Easy to damage and cracks appear in few years
  • Almost everyone else has same surface
  • Oily surface and chemicals used in mix
Prepared for asphalt driveway will cost you around $5 per square foot to finish. The contractors that take care of entire process from taking out old driveway surface, install subsurface and compact the ground with new asphalt on top, will charge on average $5500 per regular size driveway at single home property.

2. Concrete

What we call concrete is a mixture of Portland cement, aggregate as well as sand with gravel. Suggested thickness of concrete for driveway is 6 inches. The mixture needs to cure without being touched or driven on top for several days. Pros of Concrete Driveway
  • Durable material for large weights
  • Long lifespan if installed properly
  • Winter and summer friendly
Cons of Concrete Driveway
  • Has marks and stains over time
  • Hard to repair without replacement
  • Super hard to DIY
To hire contractors for concrete driveway it will cost around $7-$9 per square foot. This will include site preparation with gravel spread and new concrete installation. They will order full truck of concrete (or several for larger driveways) to pour inside forming. Smoothening and curing is required after installation.

3. Paver Stone

The most luxurious material that you can use to create driveway path with is paver stone. It is made out of natural stone with uneven rough shapes that have different line patterns. Paver stones are very heavy and are perfect for weights on top of them. Almost every city in Europe has roads and walks made out of stone that were installed centuries ago. Pros of Paver Stone Driveway
  • Creative designs can be done
  • Personal looks, can match the house
  • Can replace single stone in minutes
Cons of Paver Stone Driveway
  • Weeds growing through
  • Stone can move over time
  • Most expensive material
There is wide selection of stone that can be purchased for your driveway. On average we recommend settling with $17-$20 per square foot for stone with installation included. Working with this material is very intense labor and we recommend hiring professionals that do this type of work every day.

4. Crushed Stone

Our readers sometimes mistake crushed stone with gravel, but this is not the same material. Crushed stone material is achieved when machine is mechanically crushing larger pieces of unused stone for this specific purpose. It is larger than gravel and can have smooth finish. Crushed stone can also have a mix of colors, which is much pleasant to eyes than gravel. Pros of Crushed Stone Driveway
  • Low maintenance required
  • Fits rural area style
  • Can be reused for other purposes
Cons of Crushed Stone Driveway
  • Gets very hot during summer
  • Can be messy after many drives
  • Hard to remove snow and ice
Buying crushed stone and installing it on your driveway is as easy as it gets. Similar to other rough materials discussed in this post, only small tools like shovels, dolly and buckets are required to spread it on the road. The cost of crushed stone driveway is between $4 and $6 per square foot from professional local contractors that can finish the job in several days.

5. Brick

The same brick we see being used in wall construction can be installed as top driveway surface. Brick is manufactured by compressing clay with plastic mass. It is heated to extreme temperature and dried up to become as solid as you know it. Pros of Brick Driveway
  • Variety of selections in shapes and shades
  • Bricks are recyclable
  • Slip resistant with rough top part
Cons of Brick Driveway
  • Needs regular maintenance
  • Change color over time
  • Old fashion looking
Installing brick on driveway costs $10 per square foot, which is not too far from masonry brick laying as part of the wall. To save money you can use or purchase old brick, that was part of a wall before. Do not mix these two jobs and contact landscaping professionals instead of masonry contractors that work with bricks.

6. Seashell

This material is popular on the coast line where shells can be found near the water. Construction companies use seashells to add in other materials as well as spread them on driveway in rough condition, without adding anything else. It usually comes in white or pearl color and darkens within year because of mixing with sand and dirt. Pros of Seashell Driveway
  • Environmentally friendly
  • Has natural drainage
  • Creates worm vibe of beach house
Cons of Seashell Driveway
  • Break and crack under light weight
  • Sharp and very hard to walk on
  • Gets stuck in shoes and tires
To deliver and spread seashells on driveways costs below $4, which is only slightly more expensive than rough gravel. As you go further from coast line, cost of material increases due to delivery. This material is elegant and very soft. We recommend adding edge lines with darker color landscape material to create visual path.

7. Gravel

This material is used in other construction mixes and underlayment systems. It’s literally fragments and small crushed stones that are put on top of soil. It is easily spread out by hands and anyone can do it. Pros of Gravel Driveway
  • Cheapest of them all
  • Easy DIY Job
  • Can install another material on top
Cons of Gravel Driveway
  • Needs to be graded very often
  • Will mix with dirt and leaves
  • Washes up with heavy rains
It is rough material and can be purchased in bulk (by metric tons or cubic meters). The cost of driveway with gravel should not exceed $3 per square foot, but you can save tons of money by purchasing materials and doings installation by yourself. You do not require specific tools or heavy equipment for the job and delivery of gravel can be arranged directly to your project.

Conclusion

To properly finish any and all of these driveways requires skills and experience. There is no way you can complete any of these projects without heavy equipment and tools that regular home owner’s just store in their garages. Most of those who will read this post will prefer to install asphalt driveway, because of its popularity and low costs. We want to encourage home owners to go for personal preference and what matches your house, rather than getting the most affordable and popular items. Driveway jobs have to be completed fast; otherwise you will need to park elsewhere while the project is running. To not overpay, ask us for quotation sample on material you prefer in specific region where the work need to be done and our team can provide some numbers.